Mauritius: Improvement & Modernisation of Plaissance Airport
| Client | Govt. of Mauritius |
| Consultant | AAI |
| Cost | US $40,000 |
| Commencement | March 1984 |
| Completion | March 1986 |
| AAI undertook the feasibility study for improvement and modernization of Plaisance Airport in Mauritius, including air field pavements, air field lighting and on acceptance of the report, AAI deputed its specialists in the field of Civil & Electrical engineering for advising/consultancy to the executing agency during construction/implementation of the project scheme. | |
Yemen: Alghaidha Airport
| Client | Republic of Yemen |
| Consultant | Kocks GMBH, Germany |
| Cost | US $23.64 Million |
| Commencement | June 1983 |
| Completion | December 1986 |
| After successful completion of Riyan Airport Project, the Govt. of Yemen awarded the consultancy contract to AAI for Algidha Airport followed by construction contract. The project included construction of runway, link taxiway, apron, administrative blocks, terminal and other ancillary buildings. The construction materials such as cement, bitument, including plant & machinery were required to be transported by sea. | |
Libya: Brak Airport Stage - II
| Client | Libyan Govt |
| Consultant | Italconsult, Italy |
| Cost | US $41.60 Million |
| Commencement | June 1982 |
| Completion | April 1985 |
| Extension of runway 1350mtr x 45mtr; secondary runway 1600mtr; x 30mtr; Parallel taxiway 2600m long; Parking apron, Internal Roads, Chain link fencing etc. | |
Algeria: Batna Airport
| Client | Republic of Algeria |
| Consultant | AAI |
| Cost | US $0.51 Million |
| Commencement | June 1982 |
| Completion | December 1984 |
| This was consultancy project for development of Airport in Batna, Algeria. The scope of work included preparation of detailed reconnaissance, topographic survey, hydrological investigations, development of airport master plan and detailed engineering drawings, design of air-field pavements, foundation engineering for ground improvement, design of drainage system, design of air-field lighting and visual aids system. Design of air-side operational roads and design of city side traffic circulation system, roads and parking areas. Preparation of bill of quantities, cost estimate and tender document. The scope of work also included planning for navigational aids and fuel farm. | |
Algeria: Setif Airport
| Client | Republic of Algeria |
| Consultant | AAI |
| Cost | US $1.10 Million |
| Commencement | June 1982 |
| Completion | December 1984 |
| This was consultancy project for development of Airport in Setif, Algeria. The scope of work included preparation of detailed reconnaissance, topographic survey, hydrological investigations, development of airport master plan and detailed engineering for ground improvement, design of drainage system, design of air-field lighting and visual aids system. Design of air-side operational roads and design of city side traffic circulation system, roads and parking areas. Preparation of bill of quantities, cost estimate and tender document. The scope of work also included planning for navigational and communication aids and fuel farm. | |
Nauru: Design / Preparation / Documents for Extension of Runway
| Client | Republic of Nauru |
| Consultant | AAI |
| Cost | US $96,000 |
| Commencement | January 1982 |
| Completion | January 1983 |
| The existing facility at airport were not adequate for the safe operation of wide-bodied aircraft and it required extension of runway on reclaimed land from shallow sea. The scope of work consisted of two components:
|
|
Yemen: Alghaidha Airport
| Client | Republic of Yemen |
| Consultant | AAI |
| Cost | US $23.64 Million |
| Commencement | April 1981 |
| Completion | July 1986 |
| Consultancy of design of runway, link taxiway, apron, administrative blocks, terminal and other ancillary buildings. This consultancy project for design aspects ultimately was converted by Republic of Yemen into a turn-key project for airport development. | |
Tanzania: Mafia Airport
| Client | Govt. of Tanzania |
| Consultant | AAI |
| Cost | US $0.016 Million |
| Commencement | April 1981 |
| Completion | July 1982 |
| The project included development work including preparation of report, detailed engineering drawing and other associated documents. | |
Yemen: Riyan Airport
| Client | Republic of Yemen |
| Consultant | Kocks GMBH, Germany |
| Cost | US $25.69 Million |
| Commencement | November 1979 |
| Completion | May 1982 |
| Construction of runway, link taxiway, apron, terminal building, cargo and other ancillary buildings including bulk services, air-field lighting etc. Construction material such as cement bitumen etc., including plant and machinery was transported by the barges for timely completion of the work. The entire project was executed in-house by AAI using latest equipment and machinery. The local available materials were largely used for keeping the project cost within the stipulated limit. | |
Maldives: Hulule Airport
| Client | Government of Maldives |
| Consultant | Kocks GMBH, Germany |
| Cost | US $11.00 Million |
| Commencement | April 1978 |
| Completion | November 1981 |
| Extension & resurfacing of runway, construction of apron, terminal building, control tower, fuel tank, water supply, drainage and sewerage facilities etc. Construction was completed under difficult logistics and adverse climatic conditions besides this, building materials and machinery were also transported by sea. The runway extension was on reclaimed land on coral base. | |
Libya: Brak Airport Stage - I
| Client | Libyan Govt |
| Consultant | Italconsult, Italy |
| Cost | US $25.17 Million |
| Commencement | June 1978 |
| Completion | April 1982 |
| Construction of main runway 2500mtr x 30mtr; Parallel taxiway 960mtr x 30mtr; Aircraft Parking Apron, Powerhouse Building, Peripheral Roads and chain link fencing. The geographical location of the site posed logistics problems of movement for construction machinery and material over large desert areas and AAI's engineers were able to resolve these. | |
Libya: New Ghat Airport Project
| Client | Libyan Govt | |
| Consultant | Italconsult, Italy | |
| Cost | US $70.20 Million | |
| Commencement | January 1976 | |
| Completion | April 1979 | |
Construction of main runway 3600mtr x 45mtr; secondary runway 1500mtr x 30 mtr; Parallel taxiway 3700mtr x 30 mtr; Aprons (2 nos.) 200mtr x 100mtr terminal and other building with public address system, air-field lighting, peripheral road, internal roads and Air force camp. The adverse geographical location of the site posed logistics problems for movement of construction machinery and material over large desert areas and AAI's engineers were able to resolve these. |
||
| The work was completed in record time. Libyan authorities were so satisfied with the planning, execution and quality of the work "Ghat Airport Project" that they entrusted Brat Project to AAI without taking recourse to call of tenders. | ||