E.g., 18/03/2026
E.g., 18/03/2026
S. No. Tender No. Department Nature of Work Mode of Tender Enquiry Type of Bidding System No of Bids Received Important Dates Name of Parties Qualified After Technical Evaluation Name of Parties Not Qualified After Technical Evaluation Whether Contract Awarded to Lowest Tendered/ Evaluation L1 Contractor Details
31 Annual Maintenance Contract of Civil works at NIATAM, Birsi Airport, Gondia (2025-26) Phase-II. Engineering View Open Two Bid 2 View View Yes View
32 Annual maintenance of Horticulture work at Airport & Residential Colony, Birsi Airport, Gondia (2025-26). Engineering View Open Two Bid 8 View View Yes View
33 Development of New Civil Enclave at Bagdogra Airport. SH: Construction of Apron, Link Taxiways and Airside Infrastructure (Phase-I). Engineering View Open Two Bid 13 View View Yes View
34 Levelling and Grading of balance portion of operational area of Birsi Airport, Gondia. Engineering View Open Two Bid 3 View View Yes View
35 Design, Supply, Installation, Testing and Commissioning of on grid 60 kWp Rooftop Solar Plant on New Technical Block in Operational Area at Gaya Airport, Gaya Ji Engineering View Open Two Bid View View Yes View
36 Provision of FDA (Beam Detector) for New Integrated Cargo Terminal Building at Imphal International Airport. Engineering View Open Two Bid 2 View View Yes View
37 Improvement in Apron lighting by provision of new High Masts at Pune Airport. Engineering View Open Two Bid 5 View View Yes View
38 A/R & M/O Civil works during 2025-26 at Vijayawada Airport. SH: Repairs and Civil Maintenance works in New Terminal Building, Old Terminal Building and Operational area”. Engineering View Open Two Bid 2 View View Yes View
39 ARMO of E & M Installations at Coimbatore International Airport for the year 2025-26/2026-27. SH: Job contract for Operation and Comprehensive Maintenance of the 3x330 TR HVAC plant and ancillary equipments (For 02 Years) Engineering View Open Two Bid 6 View View Yes View
40 ARMO of E & M Installations at Coimbatore International Airport for the year 2025-26 & 2026-27. SH: Comprehensive Maintenance of Split AC Units, Water Coolers and Water cooler cum fountains at Coimbatore International Airport (02 years) Engineering View Open Two Bid 2 View View Yes View

Pages