Mission :  ''To achieve highest standards of safety and quality in air traffic services and airport management by providing state-of-the-art infrastructure for total customer satisfaction, contributing to economic growth and prosperity of the nation.''                                                                                                                                                                                                                                                                                                                 Vision :  ''To be a world-class organization providing leadership in air traffic services and airport management & making India a major hub in Asia Pacific region by 2016''.
Technical Instructions & Circular

 

List of Technical Circulars

Date Title
  List of AAI Approved Material Testing Laboratories.
16.04.09 Amendment of Tender Notice
10.08.09 Limits of Test Check
23.09.09 Limits of Test check (Amendment)
02.12.09 Profroma for calculation of cost index
03.05.10 Recovery of Mobilization Advance beyond stipulated contract period

 

List of Technical Instructions

Tl. No. Date Title
1/06 11.12.06 Modification in Global Tender 
1. 11.01.07 PQ Evaluation Criteria
2/06 29.12.07 Opening of tenders
3. 06.02.07 Lighting protection for GLF and other E&M installation
4. 07.05.07 PE, DE & NIT register
5. 01.06.07 Completion certificate of firm
6. 09.07.07 Methodology for execution in T.S
7. 25.07.07 Completion certificate
8. 26.07.07 Guarantee to water proofing treatment
9. 30.08.07 Handing over / Taking over
10. 12.12.07 Cellophane tape on C/I/O
11. 14.02.08 Uniform procedure for processing global tendering
11.
(Rev.)
27.03.08 Uniform procedure for processing global tendering (Revised)
12. 20.02.08 Guideline for uniform power supply to operational building 
13. 21.02.08 Computerized Measurement Books
14. 22.02.08 WIP board in operational area / drain design / Moorum grading
15. 12.04.08 Procurement of equipments
16. 22.05.08 NIT for design based tenders
17. 27.05.08 Mobilisation advance
18. 15.07.08 License fee for land / space attached to the contractors by AAI
19. 28.07.08 Deficiencies in respect of global tender
20. 30.07.08 EMD for global tender
21. 03.09.08 Procurement of spares and payment
22. 09.09.08 Audit para on Infrastructure policy for non-viable project
23. 18.09.08 Additional list of disturbed Areas
24. 30.09.08 Deficiencies in tender processing for global tenders
25. 26.11.08 Issue of tender by post
26. Nov.’08 Procedure for apron layout marking and finalization of master plan
27. 31.12.08 CENVAT Credit Rule 2004
28. 31.12.08 EMD in respect of Global Tenders
29. 23.01.09 Submission of EMD alongwith tender documents
30. 27.01.09 Enhancement of labour coefficient in estimate
31. 27.01.09 Contractor’s performance
31. (Ammend.) 10.08.09 Contractor performance – Amendment to TI – 31
32. Feb.’09 Co-ordination at planning stage of terminal buildings, ATC Tower, technical block, fire station etc
33. 10.02.09 Acceptance of AAI’s Tender condition
34. 24.03.09 Royalty of Construction Materials
35. 06.04.09 Listing of contractor – submission of document / certificates
36. 15.05.09 Tender processing
37. 25.05.09 JV/Consortium of firms – standard tender notice
38. 25.05.09 Challenging Arbitrator’s award
39. 28.05.09 Presentation on Foreign Training / Study tours
39A 28.05.09 Judicious Framing of Specification and Technical Requirements (STRS) for procurement of costly equipments
40. 02.06.09 Mandatory tests
41. 26.06.09 Demurrage charges
42. 15.06.09 Verification of credentials for pre-qualification
43. 15.07.09 Design of electrical panel
44. 16.07.09 Recording of hindrances
45. 20.07.09 Operationalizing new facilities : Users Satisfaction
46. 21.07.09 Procurement of Security Equipment
47. 11.08.09 Preparation of Estimate – Quotation for bulk purchase
48. 24.08.09 Similar work to be defined in PQ
49. 07.09.09 Model rules for workers – Kalyanmayee
50. 29.09.09 Adherence to Airport Master Plan : Nodal Architect
51. 01.10.09 Procurement of Equipment : Site Readiness
52. 20.11.09 Preparation of Estimate – Soil Investigation
53. 21.12.09 Guidelines for Issue of Tenders to Indian Company with Foreign Principals
54. 05.01.09 Approval of NIT  and Tender Sale
55. 06.01.10 Recording of Obstacle
56. 12.01.10 Economy in Press Advertisements for Publicity of Tenders
57. 19.02.10 Verification of Credentials of L1 bidder before Award of Work
58. 11.03.10 Forwarding NIT for Global Tenders to Foreign Embassies
59. 11.03.10 Tender for SITC of a System/Equipment : Unit Rates for AMC to be on Per Year basis
60. 31.03.10 AAI Works Manual – Modifications Regarding CP&OH, PG, escalation, rate of EI/SI           
61. 30.04.10 Specifications for Carrying out Soil Investigation for Airfield Pavements Dt. 30.04.2010
62. 15.06.10 Fee payment schedule for DRB Members
63. 30.06.10 Specification for carrying out soil investigation for Building work
64. 12.08.10 Showcause notice under Clause 2 & 3 of GCC
65. 30.08.10 Preparation of Detailed Estimate and Justification – List of Remote / Disturbed area
66. 28.09.10 Anticipatory Cost Index
67. 12.10.10 Release of withheld amount deducted against compensation for delay pending approval of FEOT against BG
68. 19.10.10 Incorporation of custom duty clause for evaluation criteria of the tender
69. 02.11.10 Revision of A/A & E/S